Photos
Enter a word or phrase to perform a general search across all records in the Photos catalog. You can also browse records in the catalog without performing a search.
Search Tips
- Searches are not case sensitive.
- Searching for multiple words connects them with OR by default. Matching records can contain any of the words.
- Connect multiple words with AND if you only want to see records containing both words.
- Use quotation marks to search for a phrase.
- Place an asterisk (*) at the end of a word as a wildcard.
2770 results found. Records searched: 2770
-
Photograph - Airship from Naval Air Station Glynco over Jekyll Island
B&W photograph of U.S. Navy airship (blimp) from Naval Air Station Glynco, flying over Jekyll Island Club grounds post World War II.
Record Type: Photo
-
Photograph - Captain Edward A. Clark, 1942
Color photo of Captain Edward A. Clark, in uniform, holding a pipe, 1942. Captain Clark was the Master of Liberty Ship SS William B. Woods. SS William B. Woods, Liberty Ship 2, was launched April 7, 1943, by Jones Construction Co., Inc., from J.A. Jones Shipyard, Brunswick, GA.
Record Type: Photo
-
Photograph - Christening, Liberty Ship SS William B. Woods
B&W photo (aerial view) of the christening of SS William B. Woods by Sponsor Mrs. Emil J. Kratts. Crew and workers line the deck, and the ship is decorated with patriotic bunting and nautical flags. Spectators and shipyard workers are in the foregroung of the photo. SS William B. Woods, Liberty Ship 2, was launched April 7, 1943, by Jones Construction Co., Inc., from J.A. Jones Shipyard, Brunswick, GA.
Record Type: Photo
-
Photograph - Combat Information Center (CIC) Training Classroom
B&W photo of Combat Information Center (CIC) training classroom, at Naval Air Tactical Training Center Building, Glynco Naval Air Station, Georgia, ca. 1962. This mockup represented the CIC found on destroyers (Essex) or cruisers. The radar repeaters in front of the supervisors position are all AN/SPA-8. (See catalog record 2016.013.020 for additional description of this equipment.) Stamped on reverse: Official US Navy Photograph
Record Type: Photo
-
Photograph - Combat Information Center (CIC) Training Classroom
B&W photo of Combat Information Center (CIC) training classroom, at Naval Air Tactical Training Center Building, Glynco Naval Air Station, Georgia, ca. 1962. This mockup represented the CIC found on aircraft carriers. The radar repeaters in front of the supervisors position are all AN/SPA-8. (See catalog record 2016.013.020 for additional description of this equipment.) Stamped on reverse: Official US Navy Photograph
Record Type: Photo
-
Photograph - Computer Room and Digital Computer
B&W photo of computer room with back side of the ten switches and AN/ASA-27 digital computer, Naval Air Tactical Training Center Building, Glynco Naval Air Station, Georgia, ca. 1962. The digital computer was machine language programmed. Stamped on reverse: Official US Navy Photograph
Record Type: Photo
-
Photograph - Computer Room and Digital Computer
B&W photo of computer room with AN/USQ-20 digital computer, Naval Air Tactical Training Center Building, Glynco Naval Air Station, Georgia, ca. 1962. The digital computer was machine language programmed, and there were 3 programmers on staff. Stamped on reverse: Official US Navy Photograph
Record Type: Photo
-
Photograph - Construction of Sidney Lanier Bridge
Color photo of the construction of the cable-stayed suspension Sidney Lanier Bridge, Brunswick, Georgia, which opened in April 2003. The bridge is 7,780 feet long and 486 feet tall. It contains 95,283 cubic yards of concrete and 14,810,095 pounds of reinforcing steel.
Record Type: Photo
-
Photograph - Construction of Sidney Lanier Bridge
Color photo of the construction of the cable-stayed suspension Sidney Lanier Bridge, Brunswick, Georgia, which opened in April 2003. The bridge is 7,780 feet long and 486 feet tall. It contains 95,283 cubic yards of concrete and 14,810,095 pounds of reinforcing steel.
Record Type: Photo
-
Photograph - Construction of Sidney Lanier Bridge
Color photo of the construction of the cable-stayed suspension Sidney Lanier Bridge, Brunswick, Georgia, which opened in April 2003. The bridge is 7,780 feet long and 486 feet tall. It contains 95,283 cubic yards of concrete and 14,810,095 pounds of reinforcing steel.
Record Type: Photo
-
Photograph - Construction of Sidney Lanier Bridge
Color photo of the construction of the cable-stayed suspension Sidney Lanier Bridge, Brunswick, Georgia, which opened in April 2003. The bridge is 7,780 feet long and 486 feet tall. It contains 95,283 cubic yards of concrete and 14,810,095 pounds of reinforcing steel.
Record Type: Photo
-
Photograph - Construction of Sidney Lanier Bridge
Color photo of the construction of the cable-stayed suspension Sidney Lanier Bridge, Brunswick, Georgia, which opened in April 2003. The bridge is 7,780 feet long and 486 feet tall. It contains 95,283 cubic yards of concrete and 14,810,095 pounds of reinforcing steel.
Record Type: Photo
-
Photograph - Construction of Sidney Lanier Bridge
Color photo of the construction of the cable-stayed suspension Sidney Lanier Bridge, Brunswick, Georgia, which opened in April 2003. The bridge is 7,780 feet long and 486 feet tall. It contains 95,283 cubic yards of concrete and 14,810,095 pounds of reinforcing steel.
Record Type: Photo
-
Photograph - Construction of Sidney Lanier Bridge
Color photo of the construction of the cable-stayed suspension Sidney Lanier Bridge, Brunswick, Georgia, which opened in April 2003. The bridge is 7,780 feet long and 486 feet tall. It contains 95,283 cubic yards of concrete and 14,810,095 pounds of reinforcing steel. The suspension bridge replaced the vertical-lift bridge, on left.
Record Type: Photo
-
Photograph - Construction of Sidney Lanier Bridge
Color photo of the construction of the cable-stayed suspension Sidney Lanier Bridge, Brunswick, Georgia, which opened in April 2003. The bridge is 7,780 feet long and 486 feet tall. It contains 95,283 cubic yards of concrete and 14,810,095 pounds of reinforcing steel.
Record Type: Photo
-
Photograph - Construction of Sidney Lanier Bridge
Color photo of the construction of the cable-stayed suspension Sidney Lanier Bridge, Brunswick, Georgia, which opened in April 2003. The bridge is 7,780 feet long and 486 feet tall. It contains 95,283 cubic yards of concrete and 14,810,095 pounds of reinforcing steel.
Record Type: Photo
-
Photograph - Construction of Sidney Lanier Bridge
Color photo of the construction of the cable-stayed suspension Sidney Lanier Bridge, Brunswick, Georgia, which opened in April 2003. The bridge is 7,780 feet long and 486 feet tall. It contains 95,283 cubic yards of concrete and 14,810,095 pounds of reinforcing steel.
Record Type: Photo
-
Photograph - Construction of Sidney Lanier Bridge
Color photo of the construction of the cable-stayed suspension Sidney Lanier Bridge, Brunswick, Georgia, which opened in April 2003. The bridge is 7,780 feet long and 486 feet tall. It contains 95,283 cubic yards of concrete and 14,810,095 pounds of reinforcing steel. The suspension bridge replaced the vertical-lift bridge, in the foreground.
Record Type: Photo
-
Photograph - Construction of Sidney Lanier Bridge
Color photo of the construction of the cable-stayed suspension Sidney Lanier Bridge, Brunswick, Georgia, which opened in April 2003. The bridge is 7,780 feet long and 486 feet tall. It contains 95,283 cubic yards of concrete and 14,810,095 pounds of reinforcing steel.
Record Type: Photo
-
Photograph - Construction of Sidney Lanier Bridge
Color photo of the construction of the cable-stayed suspension Sidney Lanier Bridge, Brunswick, Georgia, which opened in April 2003. The bridge is 7,780 feet long and 486 feet tall. It contains 95,283 cubic yards of concrete and 14,810,095 pounds of reinforcing steel.
Record Type: Photo