Skip to content
Coastal Georgia Historical Society

Photos

Enter a word or phrase to perform a general search across all records in the Photos catalog. You can also browse records in the catalog without performing a search.

Search Tips
  • Searches are not case sensitive.
  • Searching for multiple words connects them with OR by default. Matching records can contain any of the words.
  • Connect multiple words with AND if you only want to see records containing both words.
  • Use quotation marks to search for a phrase.
  • Place an asterisk (*) at the end of a word as a wildcard.

2770 results found. Records searched: 2770

  1. Photograph - Airship from Naval Air Station Glynco over Jekyll Island

    B&W photograph of U.S. Navy airship (blimp) from Naval Air Station Glynco, flying over Jekyll Island Club grounds post World War II.

    Record Type: Photo

    Airship from Naval Air Station Glynco over Jekyll Island Club
  2. Photograph - Captain Edward A. Clark, 1942

    Color photo of Captain Edward A. Clark, in uniform, holding a pipe, 1942. Captain Clark was the Master of Liberty Ship SS William B. Woods. SS William B. Woods, Liberty Ship 2, was launched April 7, 1943, by Jones Construction Co., Inc., from J.A. Jones Shipyard, Brunswick, GA.

    Record Type: Photo

    Captain Edward A. Clark, 1942
  3. Photograph - Christening, Liberty Ship SS William B. Woods

    B&W photo (aerial view) of the christening of SS William B. Woods by Sponsor Mrs. Emil J. Kratts. Crew and workers line the deck, and the ship is decorated with patriotic bunting and nautical flags. Spectators and shipyard workers are in the foregroung of the photo. SS William B. Woods, Liberty Ship 2, was launched April 7, 1943, by Jones Construction Co., Inc., from J.A. Jones Shipyard, Brunswick, GA.

    Record Type: Photo

    Christening, Liberty Ship SS William B. Woods, April 7, 1943
  4. Photograph - Combat Information Center (CIC) Training Classroom

    B&W photo of Combat Information Center (CIC) training classroom, at Naval Air Tactical Training Center Building, Glynco Naval Air Station, Georgia, ca. 1962. This mockup represented the CIC found on destroyers (Essex) or cruisers. The radar repeaters in front of the supervisors position are all AN/SPA-8. (See catalog record 2016.013.020 for additional description of this equipment.) Stamped on reverse: Official US Navy Photograph

    Record Type: Photo

    Combat Information Center (CIC) Training Classroom
  5. Photograph - Combat Information Center (CIC) Training Classroom

    B&W photo of Combat Information Center (CIC) training classroom, at Naval Air Tactical Training Center Building, Glynco Naval Air Station, Georgia, ca. 1962. This mockup represented the CIC found on aircraft carriers. The radar repeaters in front of the supervisors position are all AN/SPA-8. (See catalog record 2016.013.020 for additional description of this equipment.) Stamped on reverse: Official US Navy Photograph

    Record Type: Photo

    Combat Information Center (CIC) Training Classroom
  6. Photograph - Computer Room and Digital Computer

    B&W photo of computer room with back side of the ten switches and AN/ASA-27 digital computer, Naval Air Tactical Training Center Building, Glynco Naval Air Station, Georgia, ca. 1962. The digital computer was machine language programmed. Stamped on reverse: Official US Navy Photograph

    Record Type: Photo

    Computer Room and Digital Computer
  7. Photograph - Computer Room and Digital Computer

    B&W photo of computer room with AN/USQ-20 digital computer, Naval Air Tactical Training Center Building, Glynco Naval Air Station, Georgia, ca. 1962. The digital computer was machine language programmed, and there were 3 programmers on staff. Stamped on reverse: Official US Navy Photograph

    Record Type: Photo

    Computer Room and Digital Computer
  8. Photograph - Construction of Sidney Lanier Bridge

    Color photo of the construction of the cable-stayed suspension Sidney Lanier Bridge, Brunswick, Georgia, which opened in April 2003. The bridge is 7,780 feet long and 486 feet tall. It contains 95,283 cubic yards of concrete and 14,810,095 pounds of reinforcing steel.

    Record Type: Photo

    Construction of Sidney Lanier Bridge
  9. Photograph - Construction of Sidney Lanier Bridge

    Color photo of the construction of the cable-stayed suspension Sidney Lanier Bridge, Brunswick, Georgia, which opened in April 2003. The bridge is 7,780 feet long and 486 feet tall. It contains 95,283 cubic yards of concrete and 14,810,095 pounds of reinforcing steel.

    Record Type: Photo

    Construction of Sidney Lanier Bridge
  10. Photograph - Construction of Sidney Lanier Bridge

    Color photo of the construction of the cable-stayed suspension Sidney Lanier Bridge, Brunswick, Georgia, which opened in April 2003. The bridge is 7,780 feet long and 486 feet tall. It contains 95,283 cubic yards of concrete and 14,810,095 pounds of reinforcing steel.

    Record Type: Photo

    Construction of Sidney Lanier Bridge
  11. Photograph - Construction of Sidney Lanier Bridge

    Color photo of the construction of the cable-stayed suspension Sidney Lanier Bridge, Brunswick, Georgia, which opened in April 2003. The bridge is 7,780 feet long and 486 feet tall. It contains 95,283 cubic yards of concrete and 14,810,095 pounds of reinforcing steel.

    Record Type: Photo

    Construction of Sidney Lanier Bridge
  12. Photograph - Construction of Sidney Lanier Bridge

    Color photo of the construction of the cable-stayed suspension Sidney Lanier Bridge, Brunswick, Georgia, which opened in April 2003. The bridge is 7,780 feet long and 486 feet tall. It contains 95,283 cubic yards of concrete and 14,810,095 pounds of reinforcing steel.

    Record Type: Photo

    Construction of Sidney Lanier Bridge
  13. Photograph - Construction of Sidney Lanier Bridge

    Color photo of the construction of the cable-stayed suspension Sidney Lanier Bridge, Brunswick, Georgia, which opened in April 2003. The bridge is 7,780 feet long and 486 feet tall. It contains 95,283 cubic yards of concrete and 14,810,095 pounds of reinforcing steel.

    Record Type: Photo

    Construction of Sidney Lanier Bridge
  14. Photograph - Construction of Sidney Lanier Bridge

    Color photo of the construction of the cable-stayed suspension Sidney Lanier Bridge, Brunswick, Georgia, which opened in April 2003. The bridge is 7,780 feet long and 486 feet tall. It contains 95,283 cubic yards of concrete and 14,810,095 pounds of reinforcing steel. The suspension bridge replaced the vertical-lift bridge, on left.

    Record Type: Photo

    Construction of Sidney Lanier Bridge
  15. Photograph - Construction of Sidney Lanier Bridge

    Color photo of the construction of the cable-stayed suspension Sidney Lanier Bridge, Brunswick, Georgia, which opened in April 2003. The bridge is 7,780 feet long and 486 feet tall. It contains 95,283 cubic yards of concrete and 14,810,095 pounds of reinforcing steel.

    Record Type: Photo

    Construction of  Sidney Lanier Bridge
  16. Photograph - Construction of Sidney Lanier Bridge

    Color photo of the construction of the cable-stayed suspension Sidney Lanier Bridge, Brunswick, Georgia, which opened in April 2003. The bridge is 7,780 feet long and 486 feet tall. It contains 95,283 cubic yards of concrete and 14,810,095 pounds of reinforcing steel.

    Record Type: Photo

    Construction of Sidney Lanier Bridge
  17. Photograph - Construction of Sidney Lanier Bridge

    Color photo of the construction of the cable-stayed suspension Sidney Lanier Bridge, Brunswick, Georgia, which opened in April 2003. The bridge is 7,780 feet long and 486 feet tall. It contains 95,283 cubic yards of concrete and 14,810,095 pounds of reinforcing steel.

    Record Type: Photo

    Construction of Sidney Lanier Bridge
  18. Photograph - Construction of Sidney Lanier Bridge

    Color photo of the construction of the cable-stayed suspension Sidney Lanier Bridge, Brunswick, Georgia, which opened in April 2003. The bridge is 7,780 feet long and 486 feet tall. It contains 95,283 cubic yards of concrete and 14,810,095 pounds of reinforcing steel. The suspension bridge replaced the vertical-lift bridge, in the foreground.

    Record Type: Photo

    Construction of Sidney Lanier Bridge
  19. Photograph - Construction of Sidney Lanier Bridge

    Color photo of the construction of the cable-stayed suspension Sidney Lanier Bridge, Brunswick, Georgia, which opened in April 2003. The bridge is 7,780 feet long and 486 feet tall. It contains 95,283 cubic yards of concrete and 14,810,095 pounds of reinforcing steel.

    Record Type: Photo

    Construction of Sidney Lanier Bridge
  20. Photograph - Construction of Sidney Lanier Bridge

    Color photo of the construction of the cable-stayed suspension Sidney Lanier Bridge, Brunswick, Georgia, which opened in April 2003. The bridge is 7,780 feet long and 486 feet tall. It contains 95,283 cubic yards of concrete and 14,810,095 pounds of reinforcing steel.

    Record Type: Photo

    Construction of Sidney Lanier Bridge

Thank You!

Confirmation Message Here....