Photos
Enter a word or phrase to perform a general search across all records in the Photos catalog. You can also browse records in the catalog without performing a search.
Search Tips
- Searches are not case sensitive.
- Searching for multiple words connects them with OR by default. Matching records can contain any of the words.
- Connect multiple words with AND if you only want to see records containing both words.
- Use quotation marks to search for a phrase.
- Place an asterisk (*) at the end of a word as a wildcard.
2770 results found. Records searched: 2770
-
Photograph - Construction of Sidney Lanier Bridge
Color photo of the construction of the cable-stayed suspension Sidney Lanier Bridge, Brunswick, Georgia, which opened in April 2003. The bridge is 7,780 feet long and 486 feet tall. It contains 95,283 cubic yards of concrete and 14,810,095 pounds of reinforcing steel.
Record Type: Photo
-
Photograph - Construction of Sidney Lanier Bridge
Color photo of the construction of the cable-stayed suspension Sidney Lanier Bridge, Brunswick, Georgia, which opened in April 2003. The bridge is 7,780 feet long and 486 feet tall. It contains 95,283 cubic yards of concrete and 14,810,095 pounds of reinforcing steel.
Record Type: Photo
-
Photograph - Construction of the Sidney Lanier Bridge
Color photo of the construction of the cable-stayed suspension Sidney Lanier Bridge, Brunswick, Georgia, which opened in April 2003. The bridge is 7,780 feet long and 486 feet tall. It contains 95,283 cubic yards of concrete and 14,810,095 pounds of reinforcing steel.
Record Type: Photo
-
Photograph - Construction of the Sidney Lanier Bridge
Color photo of the construction of the cable-stayed suspension Sidney Lanier Bridge, Brunswick, Georgia, which opened in April 2003. The bridge is 7,780 feet long and 486 feet tall. It contains 95,283 cubic yards of concrete and 14,810,095 pounds of reinforcing steel.
Record Type: Photo
-
Photograph - Construction of the Sidney Lanier Bridge
Color photo of the construction of the cable-stayed suspension Sidney Lanier Bridge, Brunswick, Georgia, which opened in April 2003. The bridge is 7,780 feet long and 486 feet tall. It contains 95,283 cubic yards of concrete and 14,810,095 pounds of reinforcing steel.
Record Type: Photo
-
Photograph - Electronic Equipment Used in Training to Generate Targets
B&W photo of electronic equipment used to generate targets for Ground Controlled Approach (GCA) training, Naval Air Tactical Training Center Building, Glynco Naval Air Station, Georgia, ca. 1962. Stamped on reverse: Official US Navy Photograph
Record Type: Photo
-
Photograph - Equipment to Generate Electronic Interference during Training
B&W photo of equipment used along with training device 15F5 to generate electronic interference on the radar scopes of the trainees, Glynco Naval Air Station, Georgia, ca. 1962. Located in the "D" wing at Naval Air Tactical Training Center Building. Stamped on reverse: Official US Navy Photograph
Record Type: Photo
-
Photograph - Ground Controlled Approach (GCA) Training Classroom
B&W photo of Ground Controlled Approach (GCA) training classroom in new Naval Air Tactical Training Center Building, Glynco Naval Air Station, Georgia, ca. 1962. Stamped on reverse: Official US Navy Photograph
Record Type: Photo
-
Photograph - Ground Controlled Approach (GCA) Training Trailers
B&W photo of Ground Controlled Approach (GCA) training trailers, Glynco Naval Air Station, Georgia, ca. 1962. The nomenclature for this equipment is AN/CPN-4A. The trailers are outside the training building. Stamped on reverse: Official US Navy Photograph
Record Type: Photo
-
Photograph - Hensel Engineering Company Machine Shop, Brunswick Harbor
B&W photograph of Hensel Engineering Company Machine Shop, Brunswick Harbor, Brunswick, Georgia. Ship flying United States flag in dry dock.
Record Type: Photo
-
Photograph - Instructors Position for the Naval Tactical Data System (NTDS)
B&W photo of the instructors position for the Naval Tactical Data System (NTDS), Naval Air Tactical Training Center Building, "D" Wing, Glynco Naval Air Station, Georgia, ca. 1962. This system was all digital for both target generation and displays. (See catalog record 2016.013.020 for additional description of this equipment.) Stamped on reverse: Official US Navy Photograph
Record Type: Photo
-
Photograph - Launch of SS William B. Woods, Brunswick River
B&W photo of SS William B. Woods in the Brunswick River after its launch. Crew and workers line the deck and bridge. The ship is decorated with nautical flags, and the U. S. flag is on the stern. Depth markers are visible on the hull. SS William B. Woods, Liberty Ship 2, was launched April 7, 1943, by Jones Construction Co., Inc., from J.A. Jones Shipyard, Brunswick, GA.
Record Type: Photo
-
Photograph - Launch, SS William B. Woods
B&W photo of the SS William B. Woods after it is launched by shipyard workers into the Brunswick River. The workers stand in the shipway. Crew and workers line the deck, and the ship is decorated with patriotic bunting. SS William B. Woods, Liberty Ship 2, was launched April 7, 1943, by Jones Construction Co., Inc., from J. A. Jones Shipyard, Brunswick, Georgia.
Record Type: Photo
-
Photograph - Launch, SS William B. Woods
B&W photo of the SS William B. Woods in the shipway, as it is launched by shipyard workers. The workers stand in the shipway. Crew and workers line the deck, and the ship is decorated with patriotic bunting. SS William B. Woods, Liberty Ship 2, was launched April 7, 1943, by Jones Construction Co., Inc., from J.A. Jones Shipyard, Brunswick, GA.
Record Type: Photo
-
Photograph - Launch, SS William B. Woods, Brunswick River
B&W photo of launch of SS William B. Woods, as it slides into the Brunswick River for the first test of its seaworthiness. The ship is decorated with nautical flags. Shipyard workers line the shipway. SS William B. Woods, Liberty Ship 2, was launched April 7, 1943, by Jones Construction Co., Inc., from J.A. Jones Shipyard, Brunswick, GA.
Record Type: Photo
-
Photograph - Marine Corps Radar Antennas, Glynco Naval Air Station
B&W photo of Marine Corps radar antennas, outside the Air Traffic Control Training building at Gynco Naval Air Station, ca. 1962. Antennas from right to left: AN/TPN-36, AN/TPN-8, AN/TSQ-18, AN/SPN-35 Stamped on reverse: Official US Navy Photograph
Record Type: Photo
-
Photograph - Naval Tactical Data System (NTDS) Radar Repeaters
B&W photo of new Naval Tactical Data System (NTDS) radar repeaters in Combat Information Center (CIC) classrooms, Naval Air Tactical Training Center Building, Glynco Naval Air Station, Georgia, ca. 1962. Nomenclature AN/SYA-4. Stamped on reverse: Official US Navy Photograph
Record Type: Photo
-
Photograph - Naval Tactical Data System (NTDS) Radar Repeaters
B&W photo of new Naval Tactical Data System (NTDS) radar repeaters in Combat Information Center (CIC) classrooms, Naval Air Tactical Training Center Building, Glynco Naval Air Station, Georgia, ca. 1962. Nomenclature AN/SYA-4. The communication console is on the right. Stamped on reverse: Official US Navy Photograph
Record Type: Photo
-
Photograph - Nurse, American Red Cross Volunteer
B&W photo of an American Red Cross Volunteer nurse during World War II, as identified by the uniform sleeve patch.
Record Type: Photo
-
Photograph - Operators, Ground Controlled Approach (GCA) Classroom
B&W photo of unidentified operators inside a Ground Controlled Approach (GCA) trailer classroom, Glynco Naval Air Station, Georgia, ca. 1962. The classrooms had air conditioning. Stamped on reverse: Official US Navy Photograph
Record Type: Photo
